Title: |
BNSF 8775 (DPU) |
Description: |
The conductor had to get out to throw the new (temporary) switch off present day M2, throw the switch onto NSP spur, walk back to align the switch to the main and then rode the DPU into the plant. |
Photo Date: |
9/19/2015 Upload Date: 9/19/2015 8:20:43 PM |
Location: |
Becker, MN |
Author: |
Jacob Nelson |
Categories: |
|
Locomotives: |
BNSF 8775(SD70ACe) |
Views: |
121 Comments: 0 |